Call Us Today
(01386 861029)
This set is comprised of 3 wooden cricket stumps and bails inserted into a polyurethane base.
This set is comprised of 3 wooden cricket stumps and bails, sprung loaded and inserted into a polyurethane base.
A wooden cricket stump inserted into a polyurethane manufactured base and spike.
This set is comprised of 3 wooden cricket stumps and bails inserted into a polyurethane base.
This set is comprised of 3 wooden cricket stumps and bails, sprung loaded and inserted into a polyurethane base.
A wooden cricket stump inserted into a polyurethane manufactured base and spike.
RadFord Ezynet brings multifaceted benefits to your field:
LIGHT WEIGHT AND EASILY TRANSPORTABLE
NO METAL/NO RUST/NO PAINT
CRICKET STUMPS RETURN TO UPRIGHT POSITION
EASILY REMOVE
As cricket stumps are
easily removed, bowlers can be set targets, i.e. bowl at off stump etc
EASILY REPLACED
Individual cricket stumps can be
easily replaced saving on having to purchase a full set.
COLOUR OPTION:
Color Options Available: Green, Yellow, Orange
RadFord Ezynet brings multifaceted benefits to your field:
LIGHT WEIGHT AND EASILY TRANSPORTABLE
NO METAL/NO RUST/NO PAINT
CRICKET STUMPS RETURN TO UPRIGHT POSITION
EASILY REMOVE
As cricket stumps are
easily removed, bowlers can be set targets, i.e. bowl at off stump etc
EASILY REPLACED
Individual cricket stumps can be
easily replaced saving on having to purchase a full set.
COLOUR OPTION:
Color Options Available: Green, Yellow, Orange
Synthetic surface, artificial surface or astro turf pitches are an important part of every cricket amenity. They widen the opportunities for players of all standards and advance the sport for county clubs, local clubs, schools and local authorities.
These pitches extend the season and incur lower maintenance costs than conventional turf over the same lifetime. They reduce the risk of injury and stress on the players, enabling play to continue very early after rain and advance the value of the sport.
Synthetic surface, artificial surface or astro turf pitches are an important part of every cricket amenity. They widen the opportunities for players of all standards and advance the sport for county clubs, local clubs, schools and local authorities.
These pitches extend the season and incur lower maintenance costs than conventional turf over the same lifetime. They reduce the risk of injury and stress on the players, enabling play to continue very early after rain and advance the value of the sport.
As the cricket season draws closer, Clubs and Schools across the land will be now preparing for the season ahead. Cricket Sightscreens are a critical part of the play, and we have what we believe the premier screens in the market place. As cricket is now both a red and white ball game, our screens swivel to accommodate this. Unique patented design enables the transformation from white to red ball cricket in less than 2 minutes. When not in use panels can be set in a ‘locked open’ position to facilitate airflow through the screen and therefore dramatically reducing potential damage from the elements. Framework: post galvanised steel, with Swivel wheels fitted enabling 360-degree movement if required.
We have 2 sizes, namely 4m x 4m or 5m tall by 4m wide. Usual lead-time will be 4 weeks maximum, deliver and erected on your site.
As the cricket season draws closer, Clubs and Schools across the land will be now preparing for the season ahead. Cricket Sightscreens are a critical part of the play, and we have what we believe the premier screens in the market place. As cricket is now both a red and white ball game, our screens swivel to accommodate this. Unique patented design enables the transformation from white to red ball cricket in less than 2 minutes. When not in use panels can be set in a ‘locked open’ position to facilitate airflow through the screen and therefore dramatically reducing potential damage from the elements. Framework: post galvanised steel, with Swivel wheels fitted enabling 360-degree movement if required.
We have 2 sizes, namely 4m x 4m or 5m tall by 4m wide. Usual lead-time will be 4 weeks maximum, deliver and erected on your site.