SHORING

CF SIMCOE STREET

PATH TUNNEL

Temporary Shoring & Decking

Shoring downtown Toronto during work to expand the underground pedestrian tunnel. Project completed in two phases, phase 1 in 2021 and phase 2 in 2022.

MTO 2023-2019 - HWY 7A

Temporary Shoring

Located in Port Perry and Blackstock, Ontario, our team completed temporary shoring for the replacement of existing culverts. Our team designed and engineered the road protection systems at two culvert locations, supplied materials and completed the installation. The Port Perry Culvert (22-415C) involved a 6.5-meter deep excavation and the implementation of a unique box pile and lagging shoring system utilizing struts and deadman bracing. The roadway protection served multiple purposes include roadway protection of stage 1 and 2, supported the stage 2 road widening, as well as minimized the amount of excavation.

LET’S TALK

SOLUTIONS

170 Attwell Dr, Etobicoke, ON M9W 5Z5, Canada
170 Attwell Dr, Etobicoke, ON M9W 5Z5, Canada

Copyright 2024 Groundbreaking Foundations Inc.