RECENT PROJECTS
RECENT PROJECTS
Noise Barrier Wall
Install of complete noise wall sound barrier and retaining wall, approximately 310m long along QEW new Credit River bridge, east of Mississauga Rd. Meeting all requirements of the MTO, this included a retaining wall, jersey barriers and a grade beam to accommodate existing utilities.
87 Posts
Max height of 5.15m
4.5m deep footing with almost 1m diameter caisson
Posts approximately 11.2m in length
Noise Barrier Walls and Cladding
The Davenport Diamond Rail Grade Separation project is part of Metrolinx's GO Expansion program. To support future two-way all-day GO service on the Barrie line, a rail grade separation is being constructed at the Davenport Diamond. The project includes construction of a new rail grade separation between GO Transit’s Barrie line and CP Rail's North Toronto subdivision, as well as the addition of a second main line track on the Barrie line. Also included is staged demolition and reconstruction of a rail over road bridge at Bloor Street, a new electrical and communications building, a stormwater drainage system, fire life, safety and public egress, noise wall system and a pedestrian underpass at Paton Road.
Installation of the noise barrier wall system, installation of the base cladding system and installation of the absorptive panels behind the MSE Walls, on Wallace Bridge, CP Rail Bridge, Elevated Guideway and Dupont Street Bridge for Davenport Diamont Rail Grade Separation Project.
Noise Barrier Wall
A design and build project for the City of Mississauge, it involved 17 sites of varying lengths through the city. Noise wall height varied from 2m - 3m, with some stretches involving an additional 1m retaining wall.
Scope of work included engineering, shop drawings, traffic control, utility permitting, monitoring and isolations. Our team handled all restoration for the city boulivard as well as residential backyards.
Noise Barrier Wall
Highway 401 improvements from 0.6km east of Essex Road 42 easterly 11.2km to 1.5km west of Merlin Road. Widening to the median to provide 6 lanes of Highway 401. Design and construction of a permanent noise barrier system on Highway 401 eastbound edge of shoulder in Tilbury.
Noise barrier wall with traffic barriers approximately 1049m
MASH-TL4 SOUNDSTOP Noise Barrier System approximately 39m
Overhead Sign Footings and High Mast Light Pole Foundations
Drilling of 130+ overhead sign footings and high mast light pole footings ranging from 1m - 1.5m diameter and 6m - 9m deep.
Temporary Shoring & Decking
Shoring downtown Toronto during work to expand the underground pedestrian tunnel. Project completed in two phases, phase 1 in 2021 and phase 2 in 2022.
Noise Barrier Wall
Over 230m of noise barrier wall installed in Hamilton Ontario.